Mumbai Ahmedabad Bullet Train: Status, Route and Fares
Is the Mumbai Ahmedabad bullet train running? Get the status, route, timing and fare basics, and compare it with Vande Bharat, Shatabdi and flights.
On this page
Last updated November 2026: the Mumbai Ahmedabad bullet train is India's first true high-speed rail corridor, built by the National High Speed Rail Corporation Limited (NHSRCL) with Japanese technology under a JICA loan. The government's target is 15 August 2027, for the Surat–Bilimora section only. No fare or timetable has been announced, so treat this as a planning guide, not a booking page. For the wider picture, start with our guide to high-speed trains in India.

Featured image: N. Vivekananthamoorthy, CC BY 4.0, via Wikimedia Commons.
Mumbai Ahmedabad Bullet Train: Current Status

Status is the first thing to settle, and it changes faster than any article can follow. Read the latest position on the NHSRCL official site. Government announcements about opening phases appear on the Press Information Bureau site. Until a passenger service is announced there, plan your Mumbai to Ahmedabad trip around existing trains, flights or road. Prices and hours checked November 2026.
- Confirmed: NHSRCL is the builder and operator-in-waiting of the Mumbai–Ahmedabad High-Speed Rail corridor.
- Confirmed: Japanese technology and a JICA loan underpin the project.
- Target: 15 August 2027 for Surat–Bilimora, about 50 km of the 508 km line. A January report put full commissioning at December 2029 (Business Today, 4 November 2026).
- Not announced: fares, frequency and ticketing channel.
Route and Stations
The corridor links Mumbai in Maharashtra with Ahmedabad in Gujarat. Both end points are named in the project's own title. Intermediate stops, the Mumbai terminal location and any elevated, underground or sea sections should be taken from NHSRCL's published alignment, not from video recaps or forums. Station lists have been refined as the project progressed. Guessing which stops exist, or which side of a city a terminal sits on, is the quickest way to plan a wrong transfer.

Expected Travel Time and Fare
Projected speeds, journey times and fares are targets until trains carry paying passengers. Official figures will be labelled as projections, and stopping pattern will drive the headline time. An all-stops service will take longer than a limited-stop one. No fare has been confirmed in the material behind this page. When one is published, it will appear in rupees (₹) on NHSRCL and Indian Railways channels. Until then, treat any rupee figure on social media as unverified.
Bullet Train vs Existing Options
Today's choices on this corridor are conventional express trains, flights and road. The nearest fast rail option is the Vande Bharat Express: Routes, Booking And How It Compares. Premium day services of the Shatabdi Express: Routes, Classes and Booking Guide type suit travellers who want a reserved, same-day return. Check Indian Railways for which services currently run between Mumbai and Ahmedabad. The table uses qualitative levels only, because verified figures are not available for the bullet train.

| Factor | Bullet train (planned) | Vande Bharat / Shatabdi-type | Flight | Road |
|---|---|---|---|---|
| Headline time | Fastest rail option once running | Fast daytime rail | Shortest in the air | Longest and traffic-dependent |
| Door-to-door time | Depends on station location | City-centre stations help | Airport transfers add time | Depends on road conditions |
| Cost level | Not yet announced | Moderate | Varies widely by date | Lowest per person for groups |
| Frequency | Not yet announced | Fixed daily timings | Multiple options | Anytime |
| Reliability | To be proven in service | Generally predictable | Weather and queue risk | Traffic risk |
| Best for | Rail fans, business day trips | Planned city-to-city travel | Tight schedules | Families with luggage |
Getting To and From the Stations
Headline travel time is only part of the journey. A station outside the city centre adds a transfer at each end, and that can erase some of the time saved. Compare door-to-door time, not station-to-station time, once terminal locations are confirmed by NHSRCL. Existing city-centre services avoid that extra leg. Flights add airport check-in and road transfers instead. Luggage-heavy trips favour whichever option has the shortest last mile.
Who Should Wait, and Who Should Book Now
Business travellers on a same-day return should keep using the current fast trains and revisit this page after an official launch notice. Leisure travellers with fixed dates should book now, because an unannounced service cannot anchor a holiday plan. Families with luggage should favour a direct train or road. Anyone with a tight onward connection should not budget on projected times. If you want an overnight option, see the Vande Bharat Sleeper: Routes, Fares, Status and How It Compares page for how that format works.
Booking and Ticketing
Ticket sales for the bullet train have not been announced in the material behind this page. Watch NHSRCL and PIB for any launch notice. For regional rapid rail, which works differently from an intercity bullet train, see Namo Bharat Train Guide: Route, Fares, Timings and Stations.
Common Planning Mistakes
Three errors catch travellers most often when a new line is in the news.
- Relying on the headline travel time and ignoring transfers at both ends.
- Assuming booking is open before NHSRCL announces it.
- Using a video recap as a source for stations, fares or dates.
Corridor facts, stations and trains
Wikipedia gives the line as 508.18 km, with 12 stations: Mumbai (Bandra Kurla Complex), Thane, Virar, Boisar, Vapi, Bilimora, Surat, Bharuch, Vadodara, Anand/Nadiad, Sabarmati and Ahmedabad. Operating speed is 320 km/h, and the design speed is 350 km/h. Construction began in February 2021 with the first pillar, and the route includes a 7 km tunnel under Thane Creek. The rolling stock named is the E10 Series Shinkansen.
Because the Mumbai terminal is at Bandra Kurla Complex, not at Mumbai Central or CSMT, a trip from Western Railway's stations needs a local train or cab first.
Construction progress and cost in November 2026
NHSRCL figures to September show 371 km of viaduct and 456 km of piers done, and 98 km of track linked. More than 9,300 overhead masts stand across 206 km, and four mountain tunnels in Maharashtra have been excavated. Surat–Bilimora still needs track, electrification, signalling and testing before a passenger run. The target has slipped: it was set for 2026 in June 2022, moved to 2027 by October 2025, and became 15 August 2027 in January 2026.
The original cost estimate was about ₹1.08 lakh crore, and the Railway Board chairman has said it may reach ₹1.98 lakh crore. About ₹85,801 crore had been spent by November 2025. Reports put the Mumbai–Ahmedabad run at just over two hours once the full line opens, against seven to eight hours by car. All of this is from Business Today.
What to ride until the bullet train opens
- Vande Bharat 20901 leaves Mumbai Central at 06:00 and reaches Ahmedabad Junction at 11:35, Sunday to Friday, then runs on to Gandhinagar Capital (Total Train Info).
- Shatabdi 12009 leaves Mumbai Central at 06:20 and arrives at 12:40, Monday to Saturday: 493 km in 6h 20m (Total Train Info).
Frequently Asked Questions
What is the bullet train route in India?
The Mumbai–Ahmedabad High-Speed Rail corridor is India's first true bullet-train line. It connects Mumbai in Maharashtra with Ahmedabad in Gujarat. Stops and alignment details are published by NHSRCL.
What is the fastest train from Ahmedabad to Mumbai?
Among running services, Vande Bharat 20901 is the fastest on our listings: it leaves Mumbai Central at 06:00 and reaches Ahmedabad Junction at 11:35. The Shatabdi 12009 takes 6h 20m. The bullet train changes this answer only after a passenger service starts.
How many trains run from Mumbai to Ahmedabad?
Daytime options include Vande Bharat 20901 and Shatabdi 12009 (Monday to Saturday), and overnight expresses also run. IRCTC lists the full set for your date.
When will the Mumbai–Ahmedabad bullet train open?
The government's target is 15 August 2027 for the Surat–Bilimora section, about 50 km. Full commissioning of the 508 km line was put at December 2029 in a January report, and no date is fixed.